Work breakdown Structure (WBS) Dictionary A document that provides detailed deliverable, activity, and schedule information about each component in the work breakdown structure. | |
Work Ethic Being capable of completing tasks independently and being motivated and driven to do what needs to be done without being asked. | |
Work in Progress Limit An agreed-upon maximum number of product backlog items that can be in a given state of the development workflow at the same time within the same project. Commonly referred to as WIP Limits. | |
Work PackageThe work defined at the lowest level of the work breakdown structure for which cost and duration are estimated and managed. بسته کاری: کار تعریف شده در پایین ترین سطح ساختار شکست کار که در آن سطح هزینه و مدت زمان برآورد و مدیریت میشود.
| |
Work Package (WP) The work defined at the lowest level of the work breakdown structure (WBS) for which cost and duration can be estimated and managed. Each work package has a unique scope of work, budget, scheduled start and completion dates, and may only belong to one control account. | |
Work Performance DataThe raw observations and measurements identified during activities being performed to carry out the project work. دادههای اجرای کار یا پروژه: مشاهدات و مقادیر خام شناسایی شده در طول اجرای فعالیتهای پروژه. | |
Work Performance InformationThe performance data collected from controlling processes, analyzed in comparison with project management plan components, project documents, and other work performance information. اطلاعات عملکردی كار یا پروژه: دادههای اجرایی جمعآوریشده از فرآیندهای کنترلی، در مقایسه با اجزای برنامه مدیریت پروژه، اسناد پروژه و سایر اطلاعات عملکردی کار تجزیه و تحلیل شدند. بعبارتی از مقایسه دادههای اجرای کار با برنامههای پروژه، اطلاعات عملکردی پروژه خلق می شود. | |
Work Performance ReportsThe physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness. گزارشات عملکردی کار/پروژه: نمایش فیزیکی یا الکترونیکی اطلاعات پردازش شده عملکرد کار/پروژه که در اسناد پروژه مستند شده که هدف آن خلق تصمیمها، اقدامات و یا افزایش آگاهی ذینفعان می باشد. | |
Work Period A date or part of a date identified as a time for performing work, which may be further divided into calendar units such as shifts, hours, or even minutes. | |
Work Product An output produced as a result of some completion of work. | |
WPwork package | |