P |
|---|
Paint-DripSee Broken Comb | |
PairingSee Pair Work | |
Pair Programming Pair work that is focused on programming | |
Pair Work A technique of pairing two team members to work simultaneously on the same work item | |
Pareto ChartA histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause. The goal is to narrow down the primary causes of variance on a project and focus the energy and efforts on tackling the most significant sources of variance. نمودار پارتو: هیستوگرامی است که بر اساس فراوانی وقوع مرتب شده و نشان می دهد چه تعداد نتیجه توسط هر علت شناسایی شده ایجاد شده است. هدف، محدود کردن علل اولیه انحرافات در یک پروژه و تمرکز انرژی و تلاش بر روی مقابله با مهمترین علل انحرافات است.
| |
Pareto Diagram A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause. | |
Participant One who participates in a group activity, such as focus groups or facilitated workshops. | |
Path ConvergenceA relationship in which a schedule activity has more than one predecessor. همگرایی مسير: رابطهای که در آن یک فعالیت زمانبندی بیش از یک پیشنیاز دارد.
| |
Path DivergenceA relationship in which a schedule activity has more than one successor. واگرایی مسير: رابطهای که در آن یک فعالیت زمانبندی بیش از یک پسنیاز دارد.
| |
Payback Period (PBP) The time needed to recover an investment, usually in months or years. | |
PBPpayback period | |
PCpercent complete | |
PCTpercent complete | |
PDCAPlan-Do-Check-Act | |
PDMPrecedence Diagramming Method | |
Peer Desk Check An informal peer review completed by one or multiple peers simultaneously to look over the materials. See also peer review. | |
Peer Review Involves a review process where a coworker examines work completed by a business analyst. Commonly, the peer performing the review is another business analyst, manager, or quality control team member. See also peer desk check, inspections, and walkthrough. | |
Percent CompleteAn estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component. درصد تكميل: برآوردی که به صورت درصدی از مقدار کاری که بر روی یک فعالیت یا یک جزء ساختار شکست کار (WBS) انجام شده است، بیان میشود.
| |
Percent Complete (PC or PCT) An estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component. | |