Paint-Drip

See Broken Comb

Pairing

See Pair Work

Pair Programming

Pair work that is focused on programming

Pair Work

A technique of pairing two team members to work simultaneously on the same work item

Parametric Estimating

An estimating method in which an algorithm is used to calculate cost or duration based on historical data and project parameters.

برآورد فرمولی، برآورد پارامتريك، برآورد آماری: یک روش تخمین/برآورد که در آن از یک الگوریتم برای محاسبه هزینه یا مدت زمان بر اساس داده‌های تاریخی/گذشته و پارامترهای پروژه استفاده می‌شود.

Parametric-Estimating

Pareto Chart

A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause. The goal is to narrow down the primary causes of variance on a project and focus the energy and efforts on tackling the most significant sources of variance. 

نمودار پارتو: هیستوگرامی است که بر اساس فراوانی وقوع مرتب شده و نشان می دهد چه تعداد نتیجه توسط هر علت شناسایی شده ایجاد شده است. هدف، محدود کردن علل اولیه انحرافات در یک پروژه و تمرکز انرژی و تلاش بر روی مقابله با مهمترین علل انحرافات است.


Pareto Diagram

A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause.

Participant

One who participates in a group activity, such as focus groups or facilitated workshops.

Path Convergence

A relationship in which a schedule activity has more than one predecessor.

همگرایی مسير: رابطه‌ای که در آن یک فعالیت زمانبندی بیش از یک پیش‌نیاز دارد.

Path Convergent and Divergent

Path Divergence

A relationship in which a schedule activity has more than one successor.

واگرایی مسير: رابطه‌ای که در آن یک فعالیت زمانبندی بیش از یک پس‌نیاز دارد.

Path Convergent and Divergent

Payback Period (PBP)

The time needed to recover an investment, usually in months or years.

PBP

payback period

PC

percent complete

PCT

percent complete

PDCA

Plan-Do-Check-Act

PDM

Precedence Diagramming Method

Peer Desk Check

An informal peer review completed by one or multiple peers simultaneously to look over the materials. See also peer review.

Peer Review

Involves a review process where a coworker examines work completed by a business analyst. Commonly, the peer performing the review is another business analyst, manager, or quality control team member. See also peer desk check, inspections, and walkthrough.

Percent Complete

An estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component.

درصد تكميل: برآوردی که به صورت درصدی از مقدار کاری که بر روی یک فعالیت یا یک جزء ساختار شکست کار (WBS) انجام شده است، بیان می‌شود.

Percent Complete

 

پادکست بلایی به نام درصد تکمیل (A Curse named %Complete)

در این پادکست، دکتر علی واحدی دیز به تشریح مشکلات روش "درصد تکمیل" در اندازه‌گیری ارزش کسب شده می‌پردازد. این روش علیرغم اینکه یکی از پراستفاده‌ترین روش‌ها برای اندازه‌گیری ارزش کسب شده است، ولی بدترین روش از نظر دقت و صحت می‌باشد. برای حل این مشکل باید به سراغ روش‌های دیگر مانند روش مایلستون‌های وزن‌دار و روش شمارش واحدها و غیره رفت. ممنون از اینکه همراه ما هستید و ما را از سوالات و نظرات خود آگاه می‌کنید.




Percent Complete (PC or PCT)

An estimate expressed as a percent of the amount of work that has been completed on an activity or a work breakdown structure component.