S

SAC

schedule at completion

SAFe®

Scaled Agile Framework®

SBE

specification by example

Scaled Agile Framework (SAFe®)

A knowledge base of integrated patterns for enterprise-scale lean–agile development

Scatter Diagram

A graph that shows the relationship between two variables.

نمودار پراکندگی، نمودار همبستگی: نموداری که رابطه بین دو متغیر را نشان می دهد.

Scatter Diagram

Scenario

A case of usage of a solution often manifested as a concrete example of a use case or user story or several functional requirements specified in the sequence in which they occur.

Schedule

See project schedule.

زمانبندی: واژه زمانبندی پروژه را ببینید.

Schedule Activity

A discrete, scheduled component of work performed during the course of a project. See also activity.

Schedule Analysis

See also schedule network analysis.

Schedule at Completion (SAC)

The total schedule duration established to complete the entire work scope.

Schedule Baseline

The approved version of a schedule model that can be changed using formal change control procedures and is used as the basis for comparison to actual results. See also baseline and performance measurement baseline.

Schedule Baseline

The approved version of a schedule model that can be changed using formal change control procedures and is used as the basis for comparison to actual results.

مبنای زمانبندی: نسخه تایید/تصویب شده یک مدل زمان بندی که به عنوان مبنایی برای مقایسه با نتایج واقعی استفاده می شود و تنها وقتی می تواند تغییر کند که گامهای رویه رسمی کنترل تغییر را طی کند.

Schedule Compression

A method used to shorten the schedule duration without reducing the project scope.

فشرده‌سازی زمانبندی: روشی که برای کوتاه کردن مدت زمان پروژه بدون کاهش محدوده پروژه استفاده می شود.

Schedule Data

The collection of information for describing and controlling the schedule.

داده های زمانبندی: مجموعه ای از اطلاعات برای توصیف و کنترل زمانبندی.

Scheduled Finish Date

The point in time when work was scheduled to finish on a schedule activity. Also known as planned finish date. See also activity scheduled finish date, current finish date, and project scheduled finish date.

Scheduled Start Date

The point in time when work was scheduled to start on a schedule activity. Also known as planned start date. See also activity scheduled start date, current start date, and project scheduled start date.

Schedule Forecasts

Estimates or predictions of conditions and events in the project's future based on information and knowledge available at the time the schedule is calculated.

پیش‌بینی های زمانبندی: برآورد یا پیش‌بینی شرایط و رویدادهای آینده پروژه بر اساس اطلاعات و دانش موجود در زمان محاسبه زمان‌بندی.

Schedule Level

A project team-specified rule for the relative granularity of schedule activities in the overall schedule model.

Schedule Management Plan

A component of the project or program management plan that establishes the criteria and the activities for developing, monitoring, and controlling the schedule.

برنامه مديريت زمانبندی: بخشی از برنامه مدیریت پروژه یا طرح است که معیارها و اقدامات لازم برای تهیه، نظارت و کنترل برنامه زمانبندی را تعیین می کند.

Schedule Milestone

A significant event in the project schedule, such as an event restraining future work or marking the completion of a major deliverable. Also known as milestone activity. See also milestone.