Browse the glossary using this index

Special | A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | ALL

Page:  1  2  3  4  5  6  7  8  9  10  ...  80  (Next)
  ALL

A

A3

A way of thinking and a systematic problem-solving process that collects the pertinent information on a single A3-size sheet of paper

AC

Actual Cost

هزینه واقعی

Acceptance Criteria

A set of conditions that is required to be met before deliverables are accepted.

معيارهای پذيرش: مجموعه ای از  شرایط که لازم است قبل از پذیرش دستاوردها/تحویل دادنی ها برآورده گردد. 

Acceptance Criteria


Acceptance Test-Driven Development (ATDD)

A method of collaboratively creating acceptance test criteria that are used to create acceptance tests before delivery begins

Accepted Deliverables

Products, results, or capabilities produced by a project and validated by the project customer or sponsors as meeting their specified acceptance criteria.

دستاوردها یا تحویل دادنی‌های پذیرفته شده: محصولات، نتایج یا قابلیت‌هایی که توسط یک پروژه تولید شده و توسط مشتری یا حامیان پروژه صحه گذاری شده اند چراکه معیارهای پذیرش مشخص‌شده‌شان را برآورده کرده است.


Accuracy

Within the quality management system, accuracy is an assessment of correctness.

صحت، درستی: در سیستم مدیریت کیفیت، صحت به معنی ارزیابی درستی است.



Acquire Resources

The process of obtaining team members, facilities, equipment, materials, supplies, and other resources necessary to complete project work.

جذب منابع: فرآیند به دست آوردن اعضای تیم، امکانات، تجهیزات، مواد، لوازم و سایر منابع لازم برای تکمیل کار پروژه.

Acquisition

Obtaining human and material resources necessary to perform project activities. Acquisition implies a cost of resources and is not necessarily financial.

جذب، تأمین، اکتساب، حصول: جذب یا تأمین منابع انسانی و مادی لازم برای انجام فعالیت های پروژه. جذب/اکتساب مستلزم هزینه منابع است و لزوماً مالی نیست.

Active Listening

The act of listening completely with all senses so as to pick up all of the information that is being communicated. Active listening entails paraphrasing or reciting back what is heard to ensure accurate understanding of what has been stated.

Activity

A distinct, scheduled portion of work performed during the course of a project.

فعاليت: بخش مشخص و برنامه‌ریزی شده‌ای از کار انجام شده در طول یک پروژه.

Activity Actual Cost (AC)

The realized cost incurred for the work performed on an activity during a specific time period. See also budget at completion (BAC), earned value (EV), estimate at completion (EAC), estimate to complete (ETC), and planned value (PV).

Activity Actual Duration

The total number of work periods, in calendar units, between the activity actual start date of the schedule activity and either the data date of the schedule model, if the schedule activity is in progress, or the activity actual finish date, if the schedule activity is complete. See also actual duration.

Activity Actual Finish Date

The point in time at which a schedule activity is completed.

Activity Actual Start Date

The point in time at which a schedule activity began.

Activity Attributes

Multiple attributes associated with each schedule activity that can be included within the activity list. Activity attributes include activity codes, predecessor activities, successor activities, logical relationships, leads and lags, resource requirements, imposed dates, constraints, and assumptions.

صفات فعالیت، ویژگی‌های فعاليت، مشخصات فعالیت: چندین ویژگی مرتبط با هر فعالیت که می‌تواند در فهرست فعالیت گنجانده شود. ویژگی‌های فعالیت شامل کدهای فعالیت، فعالیت‌های پیشین، فعالیت‌های پسین، روابط منطقی، همپوشانی‌ها و تأخیرها، منابع مورد نیاز، تاریخ‌های تحمیلی، محدودیت‌ها و فرضیات است.


Activity Calendar

The project calendar or another specifically defined calendar from the calendar library assigned to the schedule activity that defines the work periods and nonwork periods in calendar format; used to replace the project calendar during schedule network analysis. See also calendar library.

Activity Code

An alphanumeric value assigned to each activity that enables classifying, sorting, and filtering.

Activity Cost Category

A breakdown of the cost, such as labor cost, equipment cost, and material cost.

Activity Cost Estimate

The projected cost of the schedule activity that includes the cost for all resources required to perform and complete the activity, including all cost types and cost components.

Activity Cumulative Probability Risk Distribution

A table of dates and their associated cumulative probabilities of occurrence for schedule activity completion.

Page:  1  2  3  4  5  6  7  8  9  10  ...  80  (Next)
  ALL